Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Apr 11, 2020     6W1 - Right Flap: debur, cortec, reassemble, rivet, hing - (10 hours)       Category: Wings
Took right flap apart and deburred. I then used the still borrowed (thanks Kevin!) airbrush and sprayed the inside of the flap. I then brushed the edges (1" foam brush). Worked great yet again! Airbrush is definately the way to go for me!

Anyhow, after it dried, I reassembled it, re-checked the level on the 12' table bars (12'x2"x1/4"), and cargo strapped that puppy back down. Cleco'd it, and riveted it. Once again had to shorten the flap trailing edge rivets by about 1/3rd.

Had to trim the hinge down just a wee little bit more, pop the hinge pin out to trim it, drilled the hinge end hole, safety wired it, and DONE.

I then built another quick hanger/shelf for the elevators in the floor joists.

READY for the next step! I belive it's the ailerons.


 